Engineering SarathiStandards desk · Nepal
Menu

Searchable standards library

Nepal's engineering rules, one clear index.

Search building codes, road and bridge specifications, all 15 PPMO SBD families plus EPC documents, amendments, circulars and material-testing references. Every selection note is tied to an official government source.

52indexed records
15 + EPCPPMO SBD families
100%source linked
Browse by collection
Issuing agency

Library results

52 documents

DoR

DoR MST

Manual of Standard Tests

Official manualTesting manual

The DoR manual collecting standard laboratory and field test procedures used for road-construction materials.

laboratoryfield testssoilaggregate
DoR

DoR CMS

Contract Management System Manual

Official manualContract manual

The DoR reference for using its contract-management system and maintaining structured contract records.

contract managementrecordsmonitoringreporting
DoR

DoR e-Library

Road and Bridge Manuals, Standards and Guidelines

Live collectionOfficial document hub

A DoR collection covering bridge standards, inspection manuals, quality-management guidance, traffic signs and other technical references.

bridge standardsinspectionquality managementtraffic signs
PPMO

SBD · EPC NCB

EPC Contract — National Competitive Bidding

PPMO publication · 2080EPC standard bidding document

PPMO's national competitive bidding format for procurement through an EPC contract.

EPCworksNCBturnkey
PPMO

SBD · Works Direct

Procurement of Works — Direct Purchase

PPMO legacy document · official archiveDirect-purchase document

The PPMO-listed documentation format for direct procurement of construction works.

worksdirect purchasedirect procurementconstruction
PPMO

SBD · Works NCB

Works NCB with Qualification Requirement — Up to NPR 20 Million

30 Sep 2022 · still listed by PPMOWorks standard bidding document

The PPMO-listed NCB works format with bidder qualification requirements for packages up to NPR 20 million.

worksNCBqualification20 million
PPMO

PQ · Works

Prequalification of Bidders

August 2019Prequalification document

The PPMO standard document for prequalifying bidders before issuing the applicable works bidding document.

worksprequalificationPQeligibility
PPMO

SQ · Works

Works — Sealed Quotation

PPMO publication · 2080Sealed quotation document

The PPMO standard sealed-quotation document for works procurement within the applicable threshold.

workssealed quotationSQquotation
PPMO

SBD · Catalogue

Procurement of Goods — Catalogue Shopping

PPMO publication · 2080Catalogue-shopping document

The PPMO document for procuring eligible proprietary goods through catalogue shopping.

goodscatalogue shoppingmanufacturerauthorized dealer
PPMO

SBD · Goods Direct

Procurement of Goods — Direct Purchase

PPMO publication · 2080Direct-purchase document

The PPMO standard documentation format for direct purchase of goods where the method is legally available.

goodsdirect purchasequotationprice reasonableness
PPMO

SQ · Goods

Procurement of Goods — Sealed Quotation

PPMO publicationSealed quotation document

The PPMO standard sealed-quotation document for goods procurement within the applicable threshold.

goodssealed quotationSQquotation
PPMO

SBD · Consulting Direct

Consulting Services — Direct Purchase

PPMO publication · 2080Consulting procurement document

The PPMO documentation format for direct procurement of consulting services where the method is legally justified.

consultingdirect purchasesingle sourceTOR
PPMO

EOI · Consulting

Consulting Services — Expression of Interest

December 2022Expression-of-interest document

The PPMO standard EOI document for inviting qualifications and preparing a consultant shortlist.

consultingEOIshortlistqualification
PPMO

RFP · Consulting

Consulting RFP — Lump-Sum Contract

Revised August 2019Standard request for proposals

The PPMO standard RFP for consulting assignments whose outputs and deliverables can be defined clearly.

consultingRFPlump sumQCBS
PPMO

RFP · Consulting

Consulting RFP — Time-Based Contract

Revised August 2019Standard request for proposals

The PPMO standard RFP for consulting assignments whose scope or duration cannot be defined precisely in advance.

consultingRFPtime basedQCBS
PPMO

SBD · Other Services

Procurement of Ration

PPMO publication · 2080Other-services bidding document

The standard PPMO document listed under procurement of other services for ration supply.

other servicesrationsupplyfood
PPMO

PPMO · Works Index

Works SBD Collection and Archive

Live official collectionOfficial document index

The controlling PPMO collection for current and retained works bidding documents, including older editions still available from the office.

worksSBDarchiveNCB
PPMO

PPMO Notice

Notice on Use of Standard Bidding Documents

17 Poush 2081Official notice

A PPMO notice directing attention to the use of prescribed standard bidding documentation in procurement proceedings.

SBDdocument usenoticecompliance
DoR

TEST · Soil

Soil and Earthwork Testing

DoR test referencePractical test index

Start here for DoR laboratory and field procedures used to characterize soil and control earthwork construction.

soilearthworkcompactiongradation
DoR

TEST · Aggregate

Aggregate and Base-Course Testing

DoR test referencePractical test index

Use the DoR test manual together with the current road specification to select procedures and acceptance requirements for aggregate and pavement layers.

aggregatebase coursegradationabrasion
DoR

TEST · Bitumen

Bituminous Materials and Asphalt Testing

Current specification pathPractical test index

Use the current DoR specification for acceptance requirements and the Manual of Standard Tests for the applicable road-material test procedures.

bitumenasphaltbinderpavement
NBSM

NBSM · NS Mark

Mandatory Products and Nepal Standard Certification

Current NBSM service listCertification reference

Check the NBSM list of products subject to mandatory Nepal Standard requirements and the current NS-mark certification information when sourcing regulated products.

Nepal StandardNS markmandatory productscertification

Source control

Use the summary to navigate.
Use the official document to decide.

Summaries are navigational and not a substitute for the controlling document. Confirm the latest gazette amendment, agency circular, project specification, contract conditions and approved test plan before design, procurement or acceptance.